near me Hydraulic Winch for Mining 1 Ton St10 Hydraulic Wire Rope Rope Lifting Towing Winch Mooring Winch for shop Crane Rope Lifter 0.5ton 1ton 2ton 3ton

Product Description

Images

Parameter Sheet
 

Model No. The 1st layer Working Pressure(Mpa) Oil Flow CZPT (L/min) Rope Dismeter(mm) Layer Wire Rope Capacity(m) Hydraulic CZPT Reduction Ratio
Pull(KN) Rope CZPT (m/min)
ST10-05 5 0-40 10 36 6 1 13 BMR-80 i=5.23
2 27
3 42
4 58
ST10-08 8 0-50 10 56 8 1 10 BMR-125 i=5.23
2 21
3 33
4 45
ST10-10 10 0-45 11 56 8 1 10 BMR-160 i=5.23
2 21
3 33
4 45
ST10-15 13 0-40 13 56 10 1 8 BMR-200 i=5.23
2 18
3 29
4 40

Our Advantage

1.Quick response within 12 hours 

2.Accept small order(MOQ:1pcs) 

3.Custom service.Unusual packaging,standard packing or as CZPT er required 

4.Excellent after-sales service 

5.Strict quality control system.100% factory testing and inspection personnel in accordance with international standards for the high-frequency sampling, to ensure the quality of products manufactured

6.Accept ODM&OEM

Factory Show&Production Details

Packing&Delivery&After-sale

1.Standard wooden case or cartonbox
2.Safety for CZPT -distance transportation
3.All of the productions will be checked carefully before delivery
Pre-sales Service
1. Inquiry and consulting support
2. Sample testing support
3. CZPT mmend the most suitable machine according to CZPT er’s purpose
4. Factory visiting welcomed
After-sales Service
1. Training how to install the machine
2. Training how to use the machine
3. Warranty 1 year
4. Engineers CZPT to service machinery oversea

FAQ

Q:1.What’s your main application?
 –Hydraulic Orbit CZPT s
 –Electric CZPT ulic Hole Punchers
 –Hydraulic Winches
–Mini Excavators

 Q:2.What is the MOQ? –MOQ:1pcs.
 
Q:3.How CZPT is your delivery time?
–Generally it is 2-3 days if the goods are in stock. or it is 7-15 days .if the goods are not in stock, it is according to quantity.

Q:4.What payment method is accepted?
–T/T,L/C,Paypal,Western union,Trade assurance,VISA

Q:5.How to Place your order ?

1).Tell us Model number ,quantity and other special requirements.

2).Proforma Invoice will be made and send for your approval.
3).Productions will be arranged upon receipt of your approval and payment or deposit.
4).Goods will be delivered as stated on the proforma invoice.