Maximum 80MPa Output 10: 1 Ratio Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Maximum 80MPa Output 10: 1 Ratio Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Complex Parameter of CZPT
 

Gas Booster Program
Task parameter
Examination medium three.5MPa nitrogen or argon
Pushed force 3-8Bar
Highest output force 80MPa
Medium temperature Standard temperature
Ambient temperature Regular temperature
Control loop one way handle loop
management strategy Guide procedure

Solution Description

We can create numerous pneumo-hydraulic pressurization systems in accordance to customers’ demands. These methods can be utilized for pressure tensioning, hydraulic drive and management, hydraulic test, and so forth. The highest strain can be up to 6400bar.
CZPT Pneumo-hydraulic Pressurization Technique has compact composition and is easy to work. What the end users require to do is only to lead the push air to the liquid port, then adjust the stress regulating valve of the generate circuit to attain the essential operating strain. 

Normal fuel pressurization procedure

Typical purposes:

1.  Static and burst examination for valves, pipe fittings, and so forth.
2.  Test for car brake technique and nozzles.
3.  Chemical reagent injection into pipelines or reaction kettles.
4. Placing coolant into jars.
5.  Providing drive for clamping, forming, drilling, shearing and stamping machines.
six. Providing buffer and lift drive to safeguard molds when huge presses overload.
seven. Static and dynamic check for aviation components.
eight. Efficiency test and calibration for instruments.
nine. Substantial pressure cleansing and drinking water injection of waterjet slicing equipment.
10. Injecting oil into lubrication technique of mechanical equipment.
11. Supplying clamping power for valve examination.
12. Supplying push drive for shaft sleeve and cylinder liner.
thirteen. Controlling floor and underground protection valves.

Our factory

FAQ

1. Shipping and delivery Phrase: FOB HangCZPT, by vessel
two. Supply Time: 15-twenty times
3. Payment Phrases: T/T (a hundred% to spend by T/T )
4. Set up / Operation / Support / Guide: In English
5. Warranty: A single yr from the day of completion of the commissioning.
six. Pre-cargo CZPT: Provider should demo run whole line at supplier’s manufacturing unit before shipment.

About delivery

Fumigation wooden cases, which are nicely sealed and powerful ample for prolonged-term trip, and suitable for multi-occasions loading & unloading by forklift.

 

Maximum 80MPa Output 10: 1 Ratio Air-Driven Gas Pressure Booster Hydraulic Test Pump System

Tags: