We are capable to provide complete solution for tank welding with different building technique, each base-to-prime and leading-to-base tank construction, hydraulic lifting technique are specially made for leading-to-base tank erection.

The pursuing quick description presents the operating process in outline. It can in particular information be modified when essential.
 
Stage one.  The tank base – plates are positioned on the geared up foundation and welded jointly.
Step 2.  The beams or lattice operate of the roof are assembled and lastly joined to the higher rim of the shell ring.
Stage three.  The jacking equipment is mounted in the tank. The plates of the 2nd shell ring (following to the top ring) are positioned exterior the first one.
Step4.   The concluded component of the tank (roof and leading shell ring) is lifted hydraulically to a top at which the plates of the 2nd ring can be moved into spot and the roof sheeting can be concluded.
Step5.   The plates of the 2nd shell ring are found precisely and welded collectively to the reduce edge of the initial ring.
Step6.   The plates of the third shell ring are positioned exterior the 2nd shell ring.
Step7.   The completed component of the tank (roof the two uppermost shell rings) is lifted.
Step8.   The over cycle of functions is repeated until the previous (bottom) shell ring is completed.
Step9.    The total tank is decreased down to the base plate and welded to this.
Step10.  The lifting tools is dismantled.