Hydraulic Container Load Ramp Leveler for Warehouse

Hydraulic Container Load Ramp Leveler for Warehouse

          CZPT Container Load Ramp Leveler for Warehouse

Introduction:
 No want installation and straightforward procedure.
Virtually no require routine maintenance.
Adopting higher toughness steel, powerful twin framework.
Improving  working efficiency, decreasing the manpower value
Load capacity from 6T to 12T offered.
Ideal for various height of truck.
Specification:

Design No. MDR-six MDR-eight MDR-10 MDR-12
Load Capacity (t) 6 eight 10 12
Platform Measurement (mm) 11000*2000 11000*2000 11000*2000 11000*2000
General Dimension(mm) 11200*2000*1400 11200*2000*1400 11200*2000*1400 11200*2000*1400
Lip Width (mm) four hundred 400 four hundred 400
Tail Board Size (mm) 800 800 800 800
Platform Length(mm) 2900 2900 2900 2900
Slope Duration(mm) 7500 7500 7500 7500
Adjustable Variety of CZPTing Peak(mm) 900~1700 900~1700 900~1700 900~1700
Working Manually Manually Manually Manually
Pit Size (mm) 2080*2040*600 2080*2040*600 2080*2040*600 2080*2040*600
Platform Materials 3mm checked metal plate +7mm metal display 4mm checked metal plate +7mm steel screen 4mm checked steel plate +7mm steel monitor 5mm checked steel plate +8mm steel screen
Lip Components 14mm Q235B plate 16mm Q235B plate 18mm Q235B plate 20mm Q235B plate
CZPTing Frame 120×60×4.five profile metal 120×60×4.five profile steel 160×80×4.5 profile steel 200×100×6 profile metal
Bed Body 120×60×4.five profile steel 120×60×4.five profile metal 120×60×4.5 profile metal 160×80×4.five profile metal
Decrease Truss one hundred*50*3 rectangle tube Q235B 100*fifty*3 rectangle tube Q235B a hundred*fifty*3 rectangle tube Q235B one hundred*fifty*three rectangle tube Q235B
Guardrails sixty*forty*3 rectangle tube Q235B sixty*40*three rectangle tube Q235B sixty*40*three rectangle tube Q235B sixty*forty*three rectangle tube Q235B
Tyre five hundred-8 strong tyre five hundred-8 solid tyre 600-nine reliable tyre 600-nine reliable tyre
Cylinder Pin 45# Ø50 rod steel*4 forty five# Ø50 rod steel*4 forty five# Ø50 rod metal*4 forty five# Ø50 rod metal*4
CZPTing CZPT Cylinder HGS collection Ø80/forty five HGS collection Ø80/45 HGS series Ø80/45 HGS collection Ø80/forty five
Lip CZPT Cylinder HGS series Ø40/twenty five HGS collection Ø40/twenty five HGS collection Ø40/twenty five HGS collection Ø40/twenty five
CZPT Oil Pipe Double wire mesh higher pressure tubing two-ten-43MPa Double wire mesh substantial force tubing two-10-43MPa Double wire mesh higher force tubing 2-10-43MPa Double wire mesh substantial strain tubing 2-ten-43MPa
CZPTal equipment Delixi Delixi Delixi Delixi
CZPT Oil ML series antiwear hydraulic oil 6L ML sequence antiwear hydraulic oil 6L ML collection antiwear hydraulic oil 6L ML collection antiwear hydraulic oil 6L
Internet Bodyweight(kg) 2350 2480 2750 3100
40’container Load Qty 3sets 3sets 3sets 3sets

Photos for Your Evaluation:

Our Support:

one.We can design and style the customerized container dock ramp as for every your necessity.
2.The most ideal design will be advisable to you once we know about your prerequisite.
3.Cargo can be organized from our port to your spot port.
four.Opetion video clip can be despatched to you if needed.
5.Maintenance video clip will be presented when the container dock ramp break down to help you restore.
6.Elements of container dock ramp can be sent to you by specific inside of seven days if needed.
 
Usually Questioned Concerns:
one.How can customer  buy areas after it crack down?
The container dock ramp adopt most of the widespread areas of hardware.You can get the elements in your regional hardware marketplace.
two.How can client restore the container dock ramp.
A single of the great benefit of the equipment is with very quite reduced failure price.Even it breaks down,we can guidebook to restore it by movie and repair instruction.
three.How lengthy is the high quality promise?
One yr good quality ensure.If it breaks down within one particular 12 months,we can ship the areas totally free of demand to you.
Certificate:ISO and CE

Firm Introdution:
HangCZPT CZPTfirst Machinery Co.,Ltd is specialized in Aerial Work Platform and Substance CZPT System.SINOFIRST is established in 2000 with great knowledge in producing and exporting.SINOFIRST facotry addresses much more than three hundred acres and a creating area of up to ten,000m2. SINOFIRST is famous for high-stop aerial equipment.Every calendar year, we spend a lot more than 10 million to create new technologies and new merchandise. CZPT advancement and investigation crew guarantee the higher high quality of SINOFIRST produdcts.Now CZPTfirst goods are extensively utilized in all in excess of the planet. Soon after support certer is below contruction in international international locations.

 

Hydraulic Container Load Ramp Leveler for Warehouse

Tags: