3 Axle Low-Bed Semi Trailer Hydraulic Low Bed with High Quality Drop Deck Extendable

3 Axle Low-Bed Semi Trailer Hydraulic Low Bed with High Quality Drop Deck Extendable

one.Item parameters
 

dimension 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american kind/germany variety can be opentional
tire 11R22.five/12R22.five/11.00R20/twelve.00R20    brand can be opentional 
wheel rim eight.25/9./8./8.5 
kingpin  2″/three.5″
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
substance:Q345B/T700
landing gear  jost c200 /fuwa  two pace 28ton 
ground 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
device box one
air wiring  doule air line 
electrical energy wiring 6 main wiring24v or 12v LED lamp
brake technique wabco relay valvedrum braket30/30 brake chamber 
paiting  full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2  coats of closing paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

1)cutting  
use the plasma reducing device lower the steel to minor areas use for suited welding and splicing
 
2)welding  
soon after metal chopping approach the following stage is welding .this method the main function is beam welding .the prime plate-base plate and the
middle  plate  will  be welding jointly .  this method will be use submerged arc welding procedure.this sort of welding is very
specific .its completely employed in I beam welding .right after this welding procedure other areas of the trailer will be use diverse welding way
for diverse metal-argon arc welding-electric powered arc welding-manual welding-fuel welding and so on
 
3)blasting
this process is use for the initial action of floor cleanness-anxiety relief-derusting ahead of paiting .
 
4)electrophoresis coating  
this method use for a lot more element floor cleanness
 
five)epoxy zinc primer spray coating 
this method is the lasting 1 ahead of paiting .following this method the trailer an be paiting
 
6)assembly
soon after all the procedure we have mationed .the final process of the trailer is assembly.this procedure all the areas will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake system and so on

7)packing 
The very last method is packing .all the trailer use diverse packing way as buyer requirment.right after packing the trailer can be on the way to the consumer

 

3 Axle Low-Bed Semi Trailer Hydraulic Low Bed with High Quality Drop Deck Extendable

Tags: